Issuing a License Manual Wells Contractors

 

Meras allows you to register in 5 organization electronically in a single step:-

Establishment

 

Required Documents

  • Physical location map, address, and GPS coordinates
  • Building license
  • Building completion certificate
  • Rent contract
  • Photo of power of attorney, authorized personnel orignal ID (if the applicant is female)
  • Photo of the location entrance

Civil Defense Requirements

  • Removal of any flammable building material in the site
  • Fire protected walls between neighbors
  • The pathways within the site must be sufficiently large to allow for easy movement of traffic
  • The site is not located in any stolen floors or annex
  • All electrical wiring is isolated, organized and connected to automatic circuit braker
  • Water heaters (if available) must be functioning with no leaks, and a safety valve
  • Gas tank (if available) is in a location far from flammable materials and is equipped with a self-locking detector and valve

special conditions

  • Registering a new supplier (suppliers and contractors portal), via the Ministry website
  • Registering key data for the application such as (name information, mobile number, e-mail)
  • The accreditation of the supplier by registering in the system
  • Submitting an electronic application for practicing drilling via the Ministry website
  • Registering the data of the institution / company
  • Registering the data of the rig ( well-drilling machines)
  • Registering the data of the drill collars, pipes / drilling pipes
  • Registering the data of the other equipment and its available numbers
  • Agreeing to the terms and conditions 
Ministry of Environment Water and Agriculture

Licensing Organization


Required Documents

  • National identity card
  • Commercial Registration Document
  • Chamber of Commerce Certificate
  • social insurance certificate
  • Certificate of Zakat and tax
  • Saudization certificate
  • Drill Form
  • The contract of sale
  • A metal plate instrument to be installed on t the rig when the license is received
No documents required for this activity / license

Duration: 2 Days
not mentioned